Cadia Mine Bridge Replacement

PROJECT
Cadia Mine Bridge Replacement over Cadiangullong Creek

DATE
2023

LOCATION
Orange NSW

CLIENT
Nelmac Pty Ltd

SECTOR
Structural Engineering, Hydrology

In November 2023, Orange NSW experienced extensive flash flooding and inundation following over 100mm of rainfall. This flash flooding resulted in the total destruction of the existing culvert across Cadiangullong Creek. As an essential access route to Newcrest’s underground and open-cut Cadia gold and copper mine, it was imperative that access was restored quickly. As such, we completed the design of the replacement bridge within 10 business days and used materials already on-hand to eliminate material lead times and expedite the construction process.

The new structure was designed in accordance with AS 5100 and RMS standards and was located well above the 1-in-100 year flood level to mitigate the risk of future flood impacts.